The 85,000-square-foot building is scheduled for completion in late 2023. In addition to modern office space, the facility will house a training center for customers and employees. The remaining space will be used for the repair of mechanical equipment and logistics. Located approximately 80 miles west of Milwaukee and 40 miles south of Madison, the new GEA facility will create more than 70 jobs.
“The Janesville facility will bring us closer to our growing Midwest customer base, and it will enable us to meet the growing demand for our products,” said Azam Owaisi, CEO of GEA North America. “As the new facility will have production capabilities to finalize separator, decanter, valve, and pump assembly, GEA will fully meet the ‘Built in America’ mandates if required. We would like to thank the city of Janesville leadership for their cooperation and support.”
Separators are machines used to separate two liquids of different densities from each other. Particularly in the pharmaceutical, dairy, food, and marine industries, separators are essential. Decanters contribute to a cleaner environment in numerous industrial applications such as wastewater and water treatment. Valves and pumps are controlled flow technology equipment, while homogenizers are a type of mixing equipment to create a uniform and consistent mixture.
The new facility will therefore feature numerous measures to make it a net-zero facility. These measures include a high efficiency heating and cooling system, solar panels, LED lighting, electric car charging stations, recycling, and water reuse possibilities.
Your local Trimble Construction Division dealer |
---|
SITECH Northwest |
In addition, GEA is working with Blackhawk Technical College in Janesville to develop an educational and training program. This will provide GEA with a pool of graduates with the desired skillset to meet the current and future workforce needs.