Dixie Contractor

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com
June 2026

Neel-Schaffer and Wright Brothers Selected for Multiple Tennessee DOT Design-Build Projects

From left to right: Mitchell Simpson, PE, Wright Brothers President/CEO and Richard Sullivan, PE, Neel-Schaffer Senior Vice President
From left to right: Mitchell Simpson, PE, Wright Brothers President/CEO and Richard Sullivan, PE, Neel-Schaffer Senior Vice President

CHARLESTON, TN — Wright Brothers Civil Construction LLC, in partnership with Neel-Schaffer Inc., has been selected by the Tennessee Department of Transportation (TDOT) to deliver two key transportation projects on critical routes across the state using the progressive design-build and design-build delivery methods. The selections include the James Robertson Parkway (SR 6) project in downtown Nashville and the I-24 Shellmound Bridges project in Marion County.

Wright Brothers and Neel-Schaffer have delivered projects together across the Southeast. Their experience includes design-build transportation projects and packages for the Georgia Department of Transportation, bridge design-build work for the South Carolina Department of Transportation, and the TDOT Apison Pike Phase III Reconstruction project.

TDOT’s use of the design-build and progressive design-build methods is intended to streamline project delivery by integrating design and construction into a single contract. This approach allows for earlier collaboration, improved risk management, and more efficient project execution while maintaining cost and schedule control.

The I-24 Shellmound Bridges project includes the replacement of both westbound and eastbound I-24 bridges. The primary objective is to deliver these improvements efficiently while maintaining traffic flow, ensuring public safety, and preserving local access throughout construction.

By leveraging the design-build framework, the project team will develop and implement construction sequencing and traffic control strategies that minimize disruption to the traveling public. The contract also requires modern roadway and bridge design standards to improve long-term corridor performance and accommodate future traffic demands.

Topcon Construction Products
Your local Topcon Positioning Systems Inc dealer
Linder Industrial Machinery
Linder Industrial Machinery

“This is exactly the type of work alternative delivery was built for,” said Mitchell Simpson, PE, President/CEO of Wright Brothers. “These projects require coordination, speed, and practical solutions in the field. Bringing the designer and contractor together from the start allows us to solve problems earlier and keep projects moving.”

The James Robertson Parkway project will reconstruct a key downtown Nashville corridor to align with the East Bank development, while the Shellmound Bridges project addresses aging infrastructure along a major interstate route. Together, they represent a broader effort by TDOT to modernize critical transportation assets across the state.

“Our partnership with Wright Brothers is built on a strong foundation of trust and a shared commitment to delivering for our clients,” said Richard Sullivan, PE, Senior Vice President at Neel-Schaffer. “That trust carries through to our work with TDOT. Our teams have built strong working relationships over time, and that confidence allows us to collaborate early, make informed decisions, and keep projects moving forward.”

Wirtgen America Inc
Your local Wirtgen America dealer
Dobbs Equipment (DXC)
Dobbs Equipment (DXC)