Dixie Contractor

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

Robins & Morton Marks Topping Out of $220M Expansion at AdventHealth Daytona Beach

DAYTONA BEACH, FL — Robins & Morton joined AdventHealth to celebrate the topping out of the $220 million expansion project at AdventHealth Daytona Beach. This expansion will increase the hospital’s footprint to nearly 1 million square feet, bringing more hospital beds, surgical suites, and critical care services to help more people access the care they need, when they need it.

The expansion adds the equivalent of an entirely new hospital to the region. Two existing towers are growing — one by four stories, the other by one — making room for:

  • 104 intensive and progressive care beds, including an expanded cardiovascular intensive care unit (CV-ICU) and a dedicated neuro-ICU unit
  • Four new surgical suites
  • Expanded imaging services, including additional CT and MRI equipment
  • A bigger pharmacy, lab, and sterile processing area to support patient care
  • Another parking lot with nearly 300 spaces for easier access

“This is about more than just adding beds and surgical suites. It’s about making sure families have access to world-class care, right here at home, in a hospital they trust,” said David Weis, Regional President and CEO for AdventHealth operations in Flagler, St. Johns, and East Volusia counties.

Robins & Morton is leading the project as the general contractor, and architect HuntonBrady designed the expansion.

Bobcat Portable Power
Your local Bobcat dealer
Pinnacle Central Co Inc

“This project has been a genuine collaboration from the skilled expertise of our construction teams to the strategic vision of AdventHealth’s leadership,” Robins & Morton Operations Manager Angel Colon said during the event. “Our team constructed the original hospital between 2006 and 2009. To be back here today, helping to shape its future, it is an incredible honor.”

Construction began in the summer of 2024 and is expected to be completed by the fall of 2026.

Iowa Mold Tooling Co Inc
Your local Iowa Mold Tooling Co Inc dealer
Nichols Fleet Equipment
Iowa Mold Tooling Co Inc
Your local Iowa Mold Tooling Co Inc dealer
Nichols Fleet Equipment
Gomaco
Your local Gomaco dealer
Ring Power Corporation
Bomag - Roller
Your local Bomag Americas dealer
Linder Industrial Machinery