Dixie Contractor

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

Jacobs Supports Innovative Bridge Modernization Effort at Port of Savannah

Photo courtesy of the Georgia Department of Transportation
Photo courtesy of the Georgia Department of Transportation

SAVANNAH, GA — Jacobs was selected to provide construction engineering and inspection (CEI) services for the U.S. 17/SR 404 Spur Bridge Major Maintenance Project by the Georgia Department of Transportation. This project will extend the lifespan and evaluate raising the elevation of the Talmadge Bridge, a critical piece of infrastructure that spans the Savannah River in the city of Savannah, Georgia, and provides a vital link between Georgia and South Carolina.

Though structurally sound, the bridge’s current 185-foot clearance restricts larger ships from navigating beneath it to access the Port of Savannah’s terminals. This project will examine raising the center of the cable stayed bridge by replacing its cables and carefully tightening them to achieve as much as 21 feet of additional clearance. The final profile is to be determined with final design and construction.

“This is a first-of-its-kind project. Raising a cable stayed bridge from its center has never been done before anywhere in the world,” Jacobs Senior Vice President Katus Watson said. “This project demonstrates Jacobs’ drive to deliver innovative solutions for the world's critical challenges — keeping people and goods moving smoothly and supporting infrastructure that drives economic prosperity.”

The Port of Savannah is a significant economic engine for the region. Larger ships are becoming increasingly more common due to their fuel efficiency and lower overall operating costs. This major maintenance project seeks to improve existing infrastructure while ensuring safe and efficient access for existing and future growth demands. Construction is expected to be completed in 2029.

Vogele
Your local Wirtgen America dealer
Power Equipment Co
Wirtgen America Inc
Your local Wirtgen America dealer
Dobbs Equipment (DXC)
Power Equipment Co
Bomag - Roller
Your local Bomag Americas dealer
Linder Industrial Machinery
SITECH
Your local Trimble Construction Division dealer
SITECH Mid-South
SITECH South
SITECH Tri-Rivers