Pacific Builder & Engineer

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

The Walsh Group Completes Information Systems Facility at Joint Base Lewis-McChord

JOINT BASE LEWIS-MCCHORD, WA — The Walsh Group, one of the largest construction service providers in the United States, has completed the new Information Systems Facility at Joint Base Lewis-McChord for the Network Enterprise Center. This project consisted of the construction of an approximately 44,000-square-foot facility that includes departmental workspaces divided into specific security zones that address special use spaces. The facility also includes administrative offices, open office space, multipurpose meeting rooms, reception area, customer support center, and loading service areas.

Elements of the steel-framed building, include exterior structural CMU walls and CFS trusses. The exterior facade is composed of modular brick, metal wall panels, aluminum windows and storefronts, and standing seem metal roof. The Information Systems Facility is the latest project to join the portfolio of work that The Walsh Group has completed across Joint Base Lewis-McChord in the last five years. Walsh recently completed the Joint Regional Confinement Facility in 2022, as well as a new air traffic control tower and maintenance hangar.

Doosan Infracore Portable Pwr
Your local Bobcat dealer
Pape Material Handling
SITECH
Your local Trimble Construction Division dealer
SITECH Northwest
Superior Industries
Your local Superior dealer
Westate Machinery Co