As lead designer, Jacobs is part of the design-build team led by Guy F. Atkinson Construction LLC (Atkinson) that will design and construct this critical project, including five new bridges and one bridge modification; stormwater conveyance and treatment facilities; and construction of active transportation infrastructure that supports walking, cycling, and other physical modes of travel.
"This project continues our strong collaboration with Atkinson in delivering best-in-class solutions to the Washington State Department of Transportation — all while creating vital transportation improvements that connect communities," Jacobs Senior Vice President Katus Watson said. "Since 2005, the Jacobs/Atkinson design-build team has delivered roadway improvements that make travel smarter, safer, and more connected."
Jacobs and Atkinson have a 19-year relationship supporting the Washington State Department of Transportation providing technical, delivery, and risk management support on projects across the Evergreen State. The team has completed several phases of the Puget Sound Gateway Program.