Building Excellence

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

American Structurepoint Celebrates Launch of the Purple Line

INDIANAPOLIS – American Structurepoint joined IndyGo and the City of Indianapolis in celebrating the launch of the Purple Line, a bus rapid transit route connecting Lawrence and eastside neighborhoods to downtown Indianapolis.

IndyGo and city officials held a ribbon-cutting ceremony in October at the Indiana State Fairgrounds. American Structurepoint provided owner’s rep services to the Indianapolis Department of Public Works (DPW) during the Purple Line’s design and construction phases. American Structurepoint engineers acted as the City’s advocate, representing DPW’s best interests when reviewing plans, specifications, and bid packages, and monitored activities for the infrastructure work along the route during construction.

The Purple Line ushers in a new era of public transportation in Indianapolis. The bus rapid transit line is designed to offer faster, more frequent service to over 58,000 residents living along it, improving access to employment, education, healthcare, and shopping opportunities.

“Our mission at American Structurepoint is to improve the quality of life for the people and communities we serve,” said President Cash Canfield. “We are proud to have played a role in providing a convenient, more accessible transportation alternative that improves connectivity in Indianapolis.”

A Purple Line rapid transit bus arrives at each station every 15 to 20 minutes during peak service times. The Purple Line overlaps with the existing Red Line south of 38th Street to the downtown Indianapolis Transit Center, with buses arriving every five minutes at those stops.

Epiroc
Your local Atlas Copco CMT USA dealer
Brandeis Machinery

The Purple Line is also a massive infrastructure project. More than half of its $188 million budget went to roadway and storm drainage improvements and pedestrian safety. Project elements included improved traffic signals, new crosswalks, 3 miles of multi-use path for pedestrians and bicyclists, 9.5 miles of new or improved sidewalk infrastructure, and 392 ADA-compliant curb ramps.

Leeboy - Pavers/Asphalt
Your local LeeBoy dealer
Brandeis Machinery
Leeboy - Pavers/Asphalt
Your local LeeBoy dealer
Brandeis Machinery
Sennebogen LLC
Your local Sennebogen LLC dealer
Brandeis Machinery