The Hagerman Group led the renovation which featured the demolition and expansion of the existing chassis assembly area to increase the functional space for racing teams to build and experiment on car parts. Washrooms, specifically for racing parts still in acceptable condition for reuse, were expanded. The retrofit and expansion of the existing graphic area allows the graphics department to expand operations and increase the amount of equipment they can utilize. The retrofit of existing storage areas on the second floor is now used as a new fitness center for racing teams and employees.
The addition featured the construction of a structural steel and precast building expansion on the south side of the existing building. This expansion increases the allowable truck storage by seven tractor-trailers which increases the working space of the entire facility. This space is also used by racing teams to showcase previous cars which have achieved a podium finish in races around the country.