Dixie Contractor

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

Florida’s Turnpike Widening Project at Dolphin Expressway Begins

MIAMI, FL — Florida’s Turnpike Enterprise has begun a widening project along Florida’s Turnpike Extension/SR 821, from SR 836/Dolphin Expressway to NW 106th Street. This project includes the following improvements:

  • Widening the Turnpike to 10 lanes, between State Road (SR) 836/Dolphin Expressway to NW 106th Street/Flagler Station Boulevard
  • Widening Turnpike bridges over SR 836/NW 12th Street, NW 25th Street, NW 41st Street, NW 58th Street and the NW 74th Street Canal
  • Converting NW 117th Avenue, between NW 34th Street and NW 41st Street, into a northbound Turnpike entrance ramp and a slip ramp for local traffic continuing on NW 117th Avenue, north of NW 41st Street
  • Interchange improvements at SR 836 and NW 12th Street, including construction of three new ramps
  • Intersection improvements at NW 12th Street, NW 41st Street and NW 74th Street
  • Constructing sound walls along qualifying residential areas adjacent to the Turnpike
  • Asphalt milling and resurfacing, guardrail and fencing, lane striping, drainage, signage and lighting improvements


It is anticipated that these improvements will cost $245 million, and construction is expected to be completed in 2024. This schedule may change due to inclement weather or unforeseen conditions.
Gomaco
Your local Gomaco dealer
Ring Power Corporation
Vogele
Your local Wirtgen America dealer
Power Equipment Co