Dixie Contractor

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

Tennessee DOT Holds Groundbreaking on SR-317 Improvement Project

COLLEGEDALE, TN — Tennessee Department of Transportation (TDOT) Commissioner Clay Bright recently joined federal, state, and local officials to officially break ground on the SR-317 (Apison Pike) improvement project in Collegedale, Tennessee.

Work is slated to begin soon on the 3.4-mile project to widen and improve the Apison Pike corridor from SR‑321 (Ooltewah-Ringgold Road) to east of Layton Lane near the Collegedale Municipal Airport. The project includes grading, drainage, construction of several new bridges and retaining walls, signals, and paving. Once completed, the roadway will have five lanes with curb and gutter, sidewalks, bike lanes, and greenway connections. Much of the project will be constructed on new alignment, including a large bridge that will span the railroad tracks.

Wright Brothers Construction Co., Inc. of Charleston, Tennessee, is the contractor for the $93.1-million project. The project is slated for completion on or before June 30, 2025.

“We are excited to begin this important project in conjunction with our federal, state, and local partners and the citizens of Collegedale,” Bright said. “Once complete, this project will improve accessibility for local and regional traffic and enhance safety in the area. Having a large bridge over the railroad tracks will eliminate the necessity for traffic to use the at-grade crossing, thereby making travel times much more predictable.”

Iowa Mold Tooling Co Inc
Your local Iowa Mold Tooling Co Inc dealer
Nichols Fleet Equipment
Epiroc
Your local Atlas Copco CMT USA dealer
Power Equipment Co