This is a future-focused project that abuts several large neighborhoods in a fast-growing area. VHB designed the extension of an existing roadway; the project included two roundabouts, a traffic signal, sidewalk, and a bridge over St. Augustine Creek. The two-lane roadway was built on a four-lane footprint to accommodate future growth in the area.
VHB worked closely with Chatham County to be mindful of the project’s impact on commuters, residents, and the natural environment. The project’s roundabouts were constructed near a busy residential area, and no businesses or homes were displaced. An existing skewed intersection was closed, and a cul-de-sac was constructed in its place after Benton Boulevard created a new, safer route. Team members also lessened the impact on the environment by designing one of the roundabouts to preserve a mature Live Oak tree.