Stantec Selected by TxDOT to Design the Expansion of US 80 in Dallas
In addition to roadway design, Stantec’s scope of work also includes the design of bridges, drainage systems, frontage road reconstruction, retaining walls, traffic signals, traffic control plans, and an intelligent transportation system. The firm will also conduct site surveys, geotechnical data collection, and sub surface utility engineering. Stantec will serve as project manager throughout the project.
A key component of the expansion will involve the reversal of one US 80 underpass to overpass bridge. The new overpass bridge is part of a TxDOT initiative to increase mobility for freight and shipping networks and improve safety for all motorists.
“The Dallas community continues to grow exponentially year after year, and with that growth comes a need for improved and expanded infrastructure,” said Cliff Hall, Vice President, Texas Transportation Practice Leader at Stantec. “We’re proud to work with TxDOT to provide services that will improve mobility and safety along this key highway in our city.”
The designs for the US 80 expansion are estimated to be completed by the end of 2022.