Michigan Contractor & Builder

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

McLaren Greater Lansing Earns 2023 AGC Build Michigan Award

LANSING, MI — The McLaren Greater Lansing Replacement Hospital in Lansing, Michigan, has been named one of four Build Michigan Award winners, recognizing it as a top Michigan health care project. Built by a joint venture consisting of Barton Malow and The Christman Company, the nine-story, 562,000-square-foot, 240-bed hospital began treating patients in 2022. Representatives from Barton Malow and Christman formally accepted the honor at the AGC of Michigan’s annual meeting.

Located on Michigan State University’s Corporate Research Park, the project implemented Lean construction practices from preconstruction through execution and prefabricated much of the building’s interior wall and mechanical, electrical, and plumbing (MEP) systems, which helped streamline the project schedule and reduce the number of on-site trades.

Some of the features of the $258-million hospital include private patient rooms, labor and delivery rooms, a dedicated ambulance entrance, a state-of-the-art emergency department, and a large, open lobby.

  • Private patient rooms: These rooms are equipped with folding couches with built-in outlets, USB ports, a modifiable table, and adjustable thermostats, and most rooms feature large windows with views.
  • Labor and delivery rooms: These rooms include additional storage and bathtubs, which makes the McLaren Greater Lansing Replacement Hospital the only Lansing hospital with bathtubs for women in labor.
  • Ambulance entrance: There are four enclosed bays to unload patients and a ground-level helicopter pad at the ambulance entrance.
  • Emergency department: The department features all private rooms, specially designed trauma rooms and elevators, an observation unit, and mental health rooms with specific features designed for patient and staff safety. Technology in the ER includes CT, X-ray, ultrasound, and vascular imaging.
  • Lobby: The large, open lobby has abundant windows and contains a coffee shop, gift shop, and cafeteria.

The Build Michigan Award was established in 1995 to recognize project team excellence. McLaren Greater Lansing also earned a National Award of Merit from the Design-Build Institute of America in September 2022.

Deere SS
Your local Deere & Co dealer
AIS Construction Equipment
SITECH
Your local Trimble Construction Division dealer
SITECH Michigan
SITECH
Your local Trimble Construction Division dealer
SITECH Michigan