“I’ve been here almost 23 years now, and I’ve never seen as much new construction, both residential and commercial, going on as we’re experiencing right now,” said Scott Brown, Fleet Superintendent for the City of Maryville. According to Brown, in this position he is responsible for outfitting city crews with the equipment they need to complete the municipality’s day-to-day applications, including utilities (electric and water), public works, grounds, maintenance, police, fire, and engineering departments. He said that with all of the new infrastructure comes the need to install more utilities, including fiber, gas and sewer lines, as well as the expectation that the work will be done right the first time. “Our residents expect nothing less than perfect from our city crews, from garbage pickup and brush collection to the fire and police departments,” added Brown. “They expect the installation of new utilities to be just as perfect. It’s how we work.”
Before adding the new VXT8 Mega Vac to the fleet, Brent Robbins, a utility work professional with the City of Maryville in the water and sewer department, said that city crews kept their trailer vacs busy. The trailers are particularly well suited for sewer line work – they’re equipped with specialty features like a jetter and hydraulic valve turning arm, so crews use it to back out valve boxes, then operate and exercise the valves.
But the two trailer units weren’t enough to keep up with demand. With the type of work the City of Maryville crews were taking on, Brown knew they needed a bigger, more powerful vac to complement the work the trailer units were doing. He called on Tim Hedrick with Vermeer Heartland for help in choosing the right model to add to their fleet. Knowing the applications that the City of Maryville crews were handling, Hedrick recommended the VXT8 Mega Vac.
“The biggest advantage of the VXT8 Mega Vac is that it has a whole lot more capacity in the tank, and it hauls more water than trailer vacs,” said Robbins. “Another advantage of our new vacuum excavator is how quiet it is to operate. All I have to do is hit the vac brakes and throttle it down, and I can stand right there beside the boom and talk with my crew. It’s also a piece of cake to run.”
Your local Link Belt dealer |
---|
Hayden-Murphy Equipment Co |
Brown added, “I'll just tell you that the best of Vermeer are my people over at Vermeer Heartland. The support we get from them over there is huge. Tim has been nothing but awesome. We work with them on vacs, as well as a wide range of other equipment that our city uses on a daily basis.”
For example, Robbins said that that happens when his crews are called to find a meter box in a flower bed, and they have to dig it up. “We'll use that vac truck to suck out the dirt around that meter box, and we don't tear up nearly as much stuff as we would if we went in there with a backhoe,” he said. On another occasion, Robbins added, the crew vacuumed out 6 to 7 feet of ditch with existing utilities in it because there was stuff in the way. “It was just a lot faster to vac it out than it would have been trying to figure out the backhoe,” he said.
One project Robbins mentioned that the crews took on with their vacs was rehabilitating sewer lines. He said, “On this rehab, we came through a few days before the project started and potholed everything out, flagging the utilities, and then we came right back in and started on the sewer.”
Robbins mentioned that the city crews have used their vacs to hydrotrench, digging 6 to 7 feet to lay new utilities into the ditch. Also, they have vac’d out some storm catch basins that had a lot of gravel and dirt in them with the VXT8 Mega Vac. “We vac them out, cleaning them out for public works,” he added.
With these Vermeer vacs, the City of Maryville crews have been able to do more work in-house, rather than outsource projects out to subcontractors. “I'd say we do 95 percent of the work with our own crews and equipment,” said Robbins. “When we get a big sewer job, we'll still sub it out because we just don't have the people to do it plus keep up with all our maintenance work. But on smaller projects, anywhere between 400 feet and 1,000 feet of line, we'll lay it ourselves.”
Your local Gomaco dealer |
---|
Hayden-Murphy Equipment Co |
Swanston Equipment Co |
Even when the City of Maryville crews call on subcontractors to help out, the vacs come in handy in helping the two parties work together quickly and efficiently. “We’ve got a lot of good contractors in the area that we work with, but we don't want to leave it all up to them on whether or not they think something should be potholed. Instead, we want to be the ones pointing the utilities out. Saying, ‘See, there it is, right there,’” Robbins said.
Robbins added, “If we have lines that are critical, like a main feeder line that runs between tanks or something, most of the time, we’ll pothole them to make sure everyone – both our crews and the contracting crews – know where the utilities are, even after they have been located. Any critical line, we pothole those ourselves. This means we’ve done our due diligence in helping these folks avoid hitting something when they’re installing new lines.”
The City of Maryville believes in providing the best quality services for its citizens. To do that efficiently and effectively, they do as much of the municipality’s work in-house as possible. “We very seldom sub stuff out anymore because we have talented, trained teams working in all of our city departments. Our people take a great amount of pride in what they do, how they do it and when they do it,” said Brown. “It’s a winning combination that keeps all the city’s public utilities operating a peak efficiency and helps maintain the beauty of the community.”