Construction

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

Skanska Celebrates Topping Out of North Carolina State University’s Integrative Sciences Building

RALEIGH, NC — Global construction and development firm Skanska announces the topping out of the Integrative Sciences Building at North Carolina State University (NC State), marking a significant milestone in the construction of the molecular sciences research and teaching facility. This achievement comes as part of Skanska’s commitment to excellence in delivering essential education projects.

As the physical core of NC State’s Integrative Sciences Initiative (ISI) program — aimed at transforming teaching, research, and discovery in chemistry and other STEM fields at NC State — the 165,947-square-foot building will showcase and celebrate the sciences. The facility, for which construction began last May, will feature classrooms, teaching labs, core research facilities, collaboration and study spaces, as well as office areas and a cafe. The building design and layout allows for flexibility to support interdisciplinary sciences such as chemistry, biochemistry, and biotechnology research.

“Designed to transform the Brickyard into a vibrant hub of innovation and education, the new Integrative Sciences Building will serve as a vital space for STEM teaching and research space at NC State,” said Mark Balling, Executive Vice President responsible for Skanska’s North Carolina and Virginia building operations. “The topping out of the project furthers our commitment to delivering facilities where future researchers can work, discover, and even manufacture life-changing medicines to promote health and longevity.”

A topping out ceremony marks the culmination of the structural phase of a construction project, typically with the placement of a final beam or brick at the highest point of a building. The current and future construction of the Integrative Sciences Building is highlighted by:

  • Over 134,000 cubic feet of concrete
  • Over 1,000 tons of structural steel used for the skeleton frame
  • 128 fume hoods to enable research
  • Air handler unit capacity of more than 190,000 cubic feet per minute
SITECH
Your local Trimble Construction Division dealer
SITECH Mid-South

To commemorate this occasion, Skanska construction and its partners were joined by North Carolina state representatives to sign the final beam as a symbol of the progress made since the project broke ground. Construction is on track for substantial completion in fall 2026.

Wirtgen America Inc
Your local Wirtgen America dealer
Dobbs Equipment
Wirtgen America Inc
Your local Wirtgen America dealer
Dobbs Equipment
Bomag - Roller
Your local Bomag Americas dealer
Linder Industrial Machinery
Volvo Roadbuilder
Your local Volvo Construction Equipment dealer
Richmond Machinery & Equipment