KFA to Perform Work on Infrastructure Improvements Plan in Rollingwood
To identify drainage issues in the city, the project team spent the first half of 2019 gathering data by distributing a public survey, holding an open house, and reviewing drainage concerns and solutions that were documented prior to this plan. The team also conducted fieldwork, created a web-based geodatabase of existing infrastructure, and developed an inundation model to assess flooding depths and velocities within the city.
Following the data collection and modeling efforts, the project team identified areas of interest and developed project concepts to address the highest priority issues. This final report includes summary sheets and cost estimates for these project concepts, as well as an analysis of potential external funding sources.
The plan’s cost summary is projected at $17.9 million, not including costs associated with improvements on Bee Caves Road or Rollingwood Drive South. The report states the projects could require significant involvement from the Texas Department of Transportation.